Reporting MWh Data as Verifier
- In order for a to upload for a particular generator, the GIS administrator must have linked that generator to your verifier account
- You will need to create a .CSV file to capture the generation data (example)
- The first line contains the unit ID number, month/year and monthly output in that order. NON12345 generating 100 MWh in the month of January would look be entered in the following manner:
- 12345, 01/2013, 100
- Note: meter data must be in whole MWh, without rounding. Any fractional generation less than 1 MWh should be carried over to the successive month.
- If uploading data for multiple generation units, you must include all the generating units in the same file. Do not upload separate CSV files for each generation unit. January data with multiple generating units would look like this:
- 12345,01/2013,100
- 55555,01/2013,350
- 44444,01/2013,600
- 33333,01/2013,50
- From the home screen, locate the Month/Year drop down bar with a file upload field immediately below
- Select the appropriate month and year and click the Browse button to select data file. After selecting the file, click Open.
- Click the Upload button.
- The data will immediately post to the generator’s account